Pre Packed Greens Mini Links Dealers Blog
 


 


With the Tour Links Putting Green System, any space becomes a golfer’s paradise.
Watch Installation Video Below



Prepare the ground for panel installation


Assemble the panels on the created terrain


Cut panels to finished shape


Insert the fastners in the outside ring of panels


Pack fill material under the cut panel edge


Install the floating cups


Install turf


Wrap the turf over the edge of the panels and secure with landscape spikes


Installation is ready for landscaping and clean-up


Finished installation